Traffic control methods on both sides for Center Line Marking – Operating Procedure
In accordance with RDA, Traffic Control Methods the following traffic operation procedure would be adopted in order to control traffic.
• Men at work 75m-100m ahead sign boards would be placed on both left hand side of the road.
• 25m away from men at work sign Narrow Road sign would be placed in order to notify the drivers with regard to road situation.
• Working area will be cordon with traffic cones to identify survey setting out to oncoming traffic on both sides.
• Traffic controllers would be deployed on both sides in order to control traffic.
• Photographs would be taken to disseminate and maintain traffic safety records.